    As I said in Post #24, I've added a "Future" Phase to our template.
    That allows you to map every Phase in the Link to Existing and Future to whatever the last one is in your project.
    The downside is that Revit likes to default things like Schedules to the last Phase in a project so you have to remember to change those to New Construction. That's tripped me up more than once.

  2.    #32
    Moderator DaveP's Avatar
    Join Date
    January 10, 2011
    Location
    St Paul, MN
    Posts
    3,549
    Current Local Time
    08:49 AM

    Not allowed! Not allowed!
    Struggling with mapping Phases through Links again today.
    Do ALL of the Phases have to match exactly? Or only the ones I'm using?
    I've got a project with a View's Phase Filter set to Show Previous + Demo and the exact same Filter in the Link
    But the Demo is no coming through as dashed, as my Phase Graphics Overrides says.
    The Phase Overrides in the link are set to different Line Types and colors, and there are not as many Phase Filters in the Link as there are in the parent.
    The ones that are there match.
    But the Link's Demo comes out solid instead of Dashed.
    I'm stumped

  3.    #33
    Forum Addict elton williams's Avatar
    Join Date
    December 7, 2010
    Location
    Gold Coast
    Posts
    2,897
    Current Local Time
    11:49 PM

    Not allowed! Not allowed!
    No they dont ALL have to match but they do if you want them to work properly as a complete timelining function.

    Is there a reason you can't set up your link to match phasing exactly?

    One of our current projects has two main arch. models with roughly 7 or 8 consultants (2 links each) and we set up all models with exact same phases /phase filters. Works a treat, after any spelling mistakes were corrected

  4.    #34
    Member
    Join Date
    December 11, 2010
    Location
    Astana
    Posts
    324
    Current Local Time
    07:49 PM

    Not allowed! Not allowed!
    I recently had a case when in a linked model, the New phase was renamed Existing and Existing to New, without changing the order.

  5.    #35
    Senior Member Alex Page's Avatar
    Join Date
    December 13, 2010
    Location
    Wellington, New Zealand
    Posts
    776
    Current Local Time
    01:49 AM

    1 Not allowed! Not allowed!
    Note that if using BIM360, ALL models need to have the same number of phases and named exactly the same. Othrwise the webviewer within the design collaboration model shows the project model phases incorrectly.
    We're now advising all our clients to make this the project norm within their BEP's:
    https://knowledge.autodesk.com/suppo...aboration.html
    Last edited by Alex Page; April 22nd, 2021 at 11:00 PM.

Similar Threads

  1. Phase Mapping
    By DaveP in forum Architecture and General Revit Questions
    Replies: 2
    Last Post: September 24th, 2015, 05:43 PM
  2. View template being over ridden by phase mapping of linked model
    By AaronCar in forum Structure - General Questions
    Replies: 2
    Last Post: August 24th, 2015, 12:34 AM
  3. Phase Mapping
    By DaveP in forum Architecture and General Revit Questions
    Replies: 2
    Last Post: September 22nd, 2014, 10:16 PM
  4. Phase Filters not working as expected with Phase Mapping
    By snowyweston in forum Architecture and General Revit Questions
    Replies: 1
    Last Post: December 19th, 2012, 11:39 AM
  5. Phases - Existing/Phase 1/Phase 2 - Braced Frame Elevations and such
    By LeanneZ in forum Structure - General Questions
    Replies: 2
    Last Post: November 11th, 2011, 12:57 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •